Work Flow for Unity

Forum posted on

Project: Armament

After reviewing project for this two week period I think we need to adjust our workflow a bit so it easier for me to review.  There is a folder below called Sandbox > MemberName > AgendaId I would like everyone to start using this folder for each agenda they do.  But I want everyone to name a folder the agenda Id they are on for task.

Wallace has the right idea as you can see below, the only thing I want to add to this is the agenda id for each task so I can run through them without hunting for the thing.  The only exception to this would be if the agenda uses an asset in the IsGameable folder you can do that without moving that asset.  But all other asset/unity files need to follow whatever folder structure you need within the agenda id folder.

Ss

Any questions about this?

Thanks,
James Fleming 
Facebook
Discord
Work Flow for Unity

737.43 SSgt Jono Lansdale Artist 3D
3/16/2018 4:20:20 PM
sounds great!

FYI the merge is done and everyone is sync up.  Before you do a check in you will need to purge your system please.  Make sure for the first few times you use the MCU that it is backing up your stuff on check in.  You can do this by going to Utility > Backup > Open Dir and look at the time date stamp folder content.

Thanks,
James Fleming 
Facebook
Discord

Just to verify you're saying I need to purge the file structure from within MCU? I've been lazy and working right out of the MCU folder so if I need to purge it and redownload I'll have to backup my stuff first, just want to double check before I go for it. 

@Wallace Yes after you do a check in don't worry about it until you start a new project.

Thanks,
James Fleming 
Facebook
Discord