Meeting Notes Producer Meeting

By: 16354.55 1stLt Lead James Fleming Producer

Meeting Started 1300

  • Reviewed art that was submitted on the last sprint talked about switching to wire frame only design
  • Talked about deleting assets from the server to manage space so we dont have to purchase more.
  • Talked about the project code structure and the meeting on TV i had with nick
  • Reviewed the automation system to adjust for lead to report via PM after sprints.
  • Reviewed agenda on the last sprint
  • Reviewed attention getting idea to make sure message are being read as much as possible
  • talked about navigation on the site and breadcrumb

Attendance
6567.92 1stLt James Fleming Lead Game Producer
548.85 GySgt Melisa Montalbano Game Producer

The agenda for this meeting for IT have been completed Melisa.


Thanks,
James Fleming


Thank you